Alpha.3 Closure Plan
Alpha.4 documentation review: This page records design or historical planning. For shipped behavior and current gaps, use the issue #135 implementation review .
v1.0.0-alpha.3 was the feature-complete pre-cutover target. This historical
plan did not
authorize a merge to main; v0.x remains the stable line until the owner
accepts the final ontology, migration, CLI, and aibox evidence.
The machine-readable gate ledger is
docs-site/data/v1_alpha3_gates.yaml. It tracks all 81 original v1 criteria
and all 15 installer criteria from issue #118. A criterion may be met,
partial, missing, owner-review, or deferred-post-cutover.
Alpha.3 closes the pre-cutover implementation work:
- complete the 89-concept ontology and 70 executable schema contracts;
- provide operational MCP, index, transition, and event parity;
- migrate representative manual-v0 and aibox-managed corpora;
- execute the retained agent-scenario and first-ART suites;
- finish installer planning, structured reconciliation, security, and Codex/Claude parity;
- validate the exact release artifact in a bare aibox container; and
- publish reproducible, signed, exact-pinnable release assets.
The G6 owner decision and every R7 criterion remain outside alpha.3 because they require an actual cutover and post-cutover observation.