ainfra
August 15, 2026 1 min read

Phase 6 shipped: Destruction, recovery, and hardening

Reviewed destruction, interruption recovery, retained run browsing, redaction, and lifecycle security hardening are available.

Phase 6 closed the destructive lifecycle and retained-evidence boundaries.

What shipped#

  • Exact reviewed destroy-plan execution and teardown evidence.
  • Durable interruption diagnosis, status, and recovery guidance.
  • Combined chronological retained-run browsing.
  • Shared pre-sink redaction and deterministic private log rotation.
  • Stronger binding, cache, permission, symlink, and hostile-input defenses.

Read the complete Phase 6 development note or inspect v1.0.0-alpha.6.